Industrial Projects

cmi.ut.ac.ir

Deutschland online bookmaker http://artbetting.de/bet365/ 100% Bonus.

Download Template Joomla 3.0 free theme.

Industrial Projects

Employer: Tadbir Sahel Pars (2007) CMI services in this project were as follows: Assessment of destructive concrete in Nitric acid, Ammonium Nitrate and Urea, Performing common tests for concrete structure…
This report presents the results of an extensive investigation and assessment of Omid half-built concrete structure, Tehran. While the construction of the structure was first started in 1975, it was…
Employers: Ati Saaz Co. (2007) The scope of this project was to investigate the use of available raw materials in site of project to achieve Self Consolidating Concrete (SCC) mix…
Employers: Tadbir Sahel Pars Consultants (2006) Purpose of this project is to investigate durability and reliability factors of concrete structures located in Bandar-e-Emam Port. Concrete has been used as jackets…
Tuesday, 21 January 2014 14:37

Karun 4 Dam Project

Employer: Iran Water& Power Resources Development (2003-2004) The preliminary studies of Karun 4 Project were carried out in 1967 in the frameworks of water resources development project and general planning…
Employer: Marin equipments of Qeshm Oil industry (2007) Purpose of this investigation project was to evaluate durability parameters in a 10 years old concrete jetty located in Qeshm Island, Persian…
Page 3 of 3
You are here: Projects Industrial Projects
maltepe escort jigololar jigolo sitesi jigolo sitesi jigolo sitesi istanbul jigolo sitesi jigolo olmak istiyorum jigolo olmak istiyorum pendik escort kartal escort manavgat escort alanya escort konya escort tuzla escort pendik escort maltepe escort kartal escort sakarya escort sakarya escort Antalya Escort